NEW |
12/11/24 |
STBG-5401(726) |
City of St. Louis, Board of Public Service, River des Peres Boulevard seeking professional engineering services for roadway infrastructure improvements |
Helen Bryant |
|
bryanth@stlouis-mo.gov |
1/17/25 |
NEW |
12/11/24 |
CMAQ-7302(714) |
St. Charles County, Fiber Interconnect Expansion |
St. Charles County Finance Department |
|
North Second Street, Room 541, St. Charles, MO 63301 |
1/9/25 |
Addendum 1 |
12/11/24 |
CMAQ-7302(714) |
St. Charles County, Fiber Interconnect Expansion |
St. Charles County Finance Department |
|
North Second Street, Room 541, St. Charles, MO 63301 |
1/9/25 |
Addendum 2 |
12/11/24 |
CMAQ-7302(714) |
St. Charles County, Fiber Interconnect Expansion |
St. Charles County Finance Department |
|
North Second Street, Room 541, St. Charles, MO 63301 |
1/9/25 |
NEW |
11/27/24 |
STP-7206-601 |
City of Hillsboro, Hillsboro Resurfacing Business 21, Resurfacing of existing pavement, correcting stormwater drainage issues, and add a right turn lane |
Buddy Russell |
636-797-3334 ext. 7 |
mayor@hillsboromo.org |
12/12/24 |
NEW |
11/13/24 |
CMAQ-6400(631) |
City of Washington, Intersection of Hwy 100 and E. Fifth Street, Adding additional second left turn lane and new dedicated right turn lane. |
Charles Stankovic |
636-390-1014 |
cstankovic@washmo.gov |
11/20/24 |
Addendum 1 |
11/13/24 |
CMAQ-6400(631) |
City of Washington, Intersection of Hwy 100 and E. Fifth Street, Adding additional second left turn lane and new dedicated right turn lane. |
Charles Stankovic |
636-390-1014 |
cstankovic@washmo.gov |
12/3/24 |
|
11/13/24 |
STBG-7306(602) |
City of St. Charles, First Capitol Drive from Fifth St to Kingshighway, Road diet, resurfacing, new sidewalks and shared use path. |
Jonathan Swagman |
636-949-3241 |
jonathan.swagman@stcharlescitymo.gov |
12/2/24 |
|
11/13/24 |
CMAQ – 7306(603) |
City of St. Charles, Fairgrounds and Friedens Signalization, Add a signal to the intersection of Fairgrounds and Friedens. |
Alex Weidenbenner |
(636) 949-3536 |
Alex.weidenbenner@stcharlescitymo.gov |
11/27/24 |
|
11/13/24 |
CRP-5502(617) |
City of Kirkwood, Leffingwell to East Elliot Avenue to Trail Head at South Holmes Avenue, A separated pedestrian and cyclist greenway trail. |
Rachel Shelley |
(314) 822-5850 |
https://kirkwoodmo.ionwave.net |
12/4/24 |
NEW |
11/13/24 |
CMAQ-5422(622) |
City of St. Louis, Traffic Management Enhancements Phase 7: South Broadway ITS (Marceau to Carroll) |
Helen Bryant |
|
bryanth@stlouis-mo.gov |
12/13/2025 |
NEW |
11/13/24 |
CMAQ-5422(621) |
City of St. Louis, Traffic Management Enhancements Phase 8: North Broadway ITS (Cass to Riverview) |
Helen Bryant |
|
bryanth@stlouis-mo.gov |
12/13/2025 |
|
10/22/24 |
BRO-R115(001) |
City of St. louis Board of Public Service, Laurel/ Waterman Bridge Reconstruction Over Metrolink Saint Louis |
Helen Bryant |
|
BryantH@stlouis-mo.gov |
11/15/24 |
|
10/18/24 |
STBP 54178(626) |
City of Lake Saint Louis, Lake Saint Louis Boulevard S Phase 3 Improvement Project |
Terry Rigdon |
636-695-4221 |
trigdon@lakesaintlouis.com |
11/14/24 |
|
10/18/24 |
STBG-5401(725) and STBG-5552(602) |
St. Louis County, Baptist Church Road and Barrett Station Road resurfacing, signal upgrades, and replace curb ramps |
Antonia Gurevich |
|
AGurevich@stlouiscountymo.gov |
11/13/24 |
|
10/8/24 |
STP-7306(604) |
City of St. Charles, Muegge Road Intersections Rehabilitation |
Alex Weidenbenner |
636-949-3536
|
Alex.Weidenbenner@stcharlescitymo.gov |
10/23/24 |
|
9/17/24 |
STBG-5410(638) |
City of Chesterfield, Resurface Old Baxter Road, reconstruct Highcroft Drive |
Anjana Kittu, PE |
636-537-4768 |
akittu@Chesterfield.mo.us |
10/9/24 |
|
9/12/24 |
TAP-7303(6247) |
City of Saint Charles, Riverwalk (Katy Trail) Path Project |
Jonathan Silver, PE |
|
jonathan.silver@stcharlescitymo.gov |
9/27/24 |
|
8/28/24 |
TAP-5410(637) |
City of Chesterfield, St. Louis County, Pathway on Parkway, Construct sidewalks |
Anjana Kittu |
636-537-4768 |
akittu@chesterfield.mo.us |
10/9/24 |
|
7/24/24 |
TAP-4939(611) |
City of Manchester, Manchester Road (MO 100) from Hwy 141 to 150 West of Knollhaven, Pedestrian Improvements: construct sidewalks, add curb ramps and entrances, install crosswalks, add pedestrian signal heads and signage. |
Dave Pracht |
636-227-1385 x168 |
dpracht@manchestermo.gov |
8/22/24 |
|
7/24/24 |
|
City of De Soto Amtrak Platrform/Station Project, conceptual planning, site structure evaluation, and infrastructure related work, etc |
Todd Melkus |
636-586-3326 |
t.melkus@desotomo.com |
8/16/24 |
|
7/10/24 |
|
City of Washington, Project: Stormwater Basin Retrofit Project |
Charles Stankovic, PE |
636-390-1014 |
cstankovic@washmo.gov |
8/1/24 |
|
6/26/24 |
TAP-5640(614) |
City of St. Peters, Spencer Road, Multi-Use Path, Phase 1 |
|
|
Bids@stpetersmo.net |
7/22/24 |
|
6/12/24 |
STBG-5610(610) |
St. Louis County, Old Halls Ferry Road, Resurfacing, ADA Upgrades, and Safety Improvements |
Shandrika Combs |
|
SCombs@stlouiscountymo.gov |
7/10/24 |
Addendum 1 |
7/1/24 |
STBG-5610(610) |
St. Louis County, Old Halls Ferry Road, Resurfacing, ADA Upgrades, and Safety Improvements Addendum 1 |
Shandrika Combs |
|
SCombs@stlouiscountymo.gov |
7/10/24 |
NEW |
6/12/24 |
STBG-5606(607) |
West Florissant Avenue, Resurfacing, ADA Upgrades, Traffic Signal Upgrades and safety Improvements |
Shandrika Combs |
|
SCombs@stlouiscountymo.gov |
7/17/24 |
Addendum 1 |
7/1/24 |
STBG-5606(607) |
West Florissant Avenue, Resurfacing, ADA Upgrades, Traffic Signal Upgrades and safety Improvements |
Shandrika Combs |
|
SCombs@stlouiscountymo.gov |
7/17/24 |
|
5/22/24 |
TAP – 6200(618) |
City of Union, Springfield Ave to W Park Ave, Pedestrian path upgrades |
J.D. Kelley |
636-583-1805 |
engineer@unionmissouri.gov |
6/14/24 |
|
5/8/24 |
TAP-7202(605) |
City of Hillsboro, Leon Hall Parkway, Add a sidewalk and a crosswalk |
Buddy Russell |
636-797-3334 |
mayor@hillsboromo.org |
6/1/24 |
|
4/10/24 |
TAP- 4901(653) |
City of Ladue, South Outer 40 Drive, Shared-Use Path, Clayton Road to Rolling Rock, Design services and Construction Engineering |
Anne C. Lamitola |
(314) 993-5665, ext. 1301 |
alamitola@cityofladue-mo.gov |
4/25/24 |
Repost |
3/27/24 |
STBG-5595(619) |
City of Florissant, MO St Catherine Street, Street Improvements |
Thomas J Goldkamp |
314-839-7643 |
tgoldkamp@florissantmo.com |
4/17/24 |
|
3/13/24 |
TAP-5401(724) |
St. Charles County, City of O'Fallon, Dardenne Greenway, from Bluebird Meadow Park to Sports Park, Extension of the Dardenne Greenway, 12’ wide trail |
Lillian Thomas |
636-379-3659 |
lthomas@ofallon.mo.us |
4/4/24 |
ADDENDUM 1 |
3/18/2024 |
TAP-5401(724) |
St. Charles County, City of O'Fallon, Dardenne Greenway, from Bluebird Meadow Park to Sports Park, Extension of the Dardenne Greenway, 12’ wide trail |
Lillian Thomas |
636-379-3659 |
lthomas@ofallon.mo.us |
4/4/24 |
|
3/13/24 |
BRO-R096(001) |
Grand Drive Bridge Reconstruction over Forest Park Parkway and Metrolink Tracks |
Helen Bryant |
N/A |
BryantH@stlouis-mo.gov |
3/27/24 |