MoDOT Northeast District

2025 Northeast Construction Guide

Interested in major road work in Northeast Missouri during 2025? Click on the Missouri map to learn more about major road projects planned for 2025. If you want a county-by-county listing, scroll down or print out the text version of the 2025 Construction Guide. All projects are scheduled for completion during 2025 unless otherwise noted.

Missouri Route 47 Bridge Replacement over U.S. 61 and Interchange Improvements at Troy in Lincoln County

The bridge replacement project on Missouri Route 47 over U.S. Route 61 at Troy in Lincoln County will update the area with a Diverging Diamond Interchange (DDI) design to efficiently move an increased volume of traffic. The project will include an ADA-compliant shared-use path for pedestrians and bicyclists, MO 47 corridor improvements between the ...

Latest News

  • Resurfacing Work Scheduled in Schuyler County

    04/25/2025

    HANNIBAL – Weather permitting, a resurfacing project located on U.S. Route 136 in Schuyler County, from U.S. Route 63 in Schuyler County to 0.3 mile west of Route N near Livonia in Putnam County, is scheduled to begin on May 1. The total length of...

Image
four modot employees

Northeast Careers

Build your career at MoDOT!

Our mission is to provide a world-class transportation system that is safe, innovative, reliable and dedicated to a prosperous Missouri.

Take a look at current openings in the Northeast District.

Learn More
About the District
Lane Miles
9,790
Bridges
1,097
District Engineer: Paula Gough