Districts Impacted
Project Summary
The intersections of Route B (Paris Road) at East Brown Station Road, Missouri Route 763 (College Avenue) at University Avenue, and College Avenue at Rollins Street in Columbia are scheduled for safety improvements in 2027, including:
Route B (Paris Road) at East Brown Station
-
Reconfigure right-turn lanes.
-
Upgrade left-turn signals for safety and traffic flow.
Route 763 (College Avenue) at University Avenue
-
Upgrade left-turn signals for safety.
College Avenue at Rollins Street
-
Add a westbound left-turn lane.
-
Upgrade left-turn signals for safety.
Current Configurations
PROJECT PROGRESS
The Missouri Department of Transportation is planning improvements to enhance safety and traffic flow at three intersections on Paris Road and College Avenue in Columbia: Paris Road at East Brown Station Road, College Avenue at University Avenue, and College Avenue at Rollins Street.
The estimated total cost (engineering, right-of-way, and construction) for this project is $700,000. This cost may change.
Maps, preliminary plans, and other information prepared by MoDOT will be available for public inspection during an online comment period this fall. Any person affected by this project may request that an in-person public meeting be held in regard to the proposed improvements. Such a meeting would be held in fall 2026. Requests for an in-person public meeting shall be in writing and must be submitted to the District Engineer at 1511 Missouri Boulevard, Jefferson City MO 65102, before Aug. 10, 2026.
The project is currently scheduled to be part of MoDOT's May 2027 letting, when contractors may submit competitive bids. The Missouri Highways and Transportation Commission may award the contract as part of their June 2027 meeting and, if the contract is awarded, a notice to proceed date will also be given. That is the earliest date the contractor may begin work.
Construction could begin in 2027, but the exact schedule of work is not known. MoDOT will work with the contractor to minimize disruptions to traffic during the school year, as much as possible.
At this time, expected impacts are:
Paris Road at East Brown Station Road
-
Staged construction to maintain at least one lane of traffic in each direction at all times.
College Avenue at University Avenue
-
Short-term lane closures expected.
College Avenue at Rollins Street
-
Eastbound Rollins Street to close from College Avenue to the first drive east of College Avenue (south side of the street) during the widening of Rollins Street.
-
The driveway entrance on the south side of Rollins Street, just east of College Avenue, will be constructed in stages to maintain one open lane at all times.
The project could span two years, if necessary, to minimize disruptions during the school year.
FREQUENTLY ASKED QUESTIONS
Why is MoDOT making these changes and improvements?
This work is being done to improve safety and traffic flow at the intersections.
What changes will be made as part of the project?
Planned improvements at Route B and East Brown Station Road include reconfiguring the right-turn lanes and upgrading the left-turn signals to improve safety and traffic flow. At Route 763 (College Avenue) and University Avenue, the left-turn signals will be upgraded to improve safety. At College Avenue and Rollins Street, the project includes adding a westbound left-turn lane and upgrading the left-turn signals to improve safety and traffic flow.
Willl any roadways be closed during construction?
At this time, Paris Road at East Brown Station Road is expected to maintain at least one lane of traffic in each direction at all times. College Avenue at University Avenue is expected to have short-term lane closures. College Avenue at Rollins Street is expected to close from College Avenue to the first drive east of College Avenue (south side of the street) during the widening of Rollins Street, just east of College Avenue, will be constructed in stages to maintain one open lane at all times.
What is the expected completion date for this project?
While construction could begin in 2027, the project could span two years, if necessary, to minimize disruptions during the school year.
What if I have further questions?
You may email cdcr@modot.mo.gov or call us at 888 ASK MODOT (1-888-275-6636). Please reference Missouri Route 763 and Route B Intersection Improvements in Boone County on your inquiries.
How can I stay updated on the project’s progress?
Sign up for project-specific updates using the form below.
-
Resurfacing project to close Route 124 at U.S. 63 next week
JEFFERSON CITY, Mo. – The access of Missouri Route 124 at U.S. Route 63 in Boone County is scheduled to close for a short period next week for resurfacing work.
Construction crews working with the Missouri Department of Transportation plan to...
-
Opportunity for in-person public meeting on planned improvements in Columbia
JEFFERSON CITY, Mo – The Missouri Department of Transportation (MoDOT) is currently designing safety improvements for several intersections in Columbia. Enhancements are planned for 2027 on Missouri Route 763 (College Avenue) at University Avenue and...
-
Planned Road Work for Mid-Missouri
JEFFERSON CITY, Mo. – The following is a list of general highway maintenance and construction work planned in the mid–Missouri area July 27 - Aug. 2, 2026.
In addition to the work listed below, other moving operations such as pothole patching, mowi...