The entire Final Environmental Impact Statement (FEIS) document is available through this page. The document is divided into segments to minimize download times.
The Final Environmental Impact Statement (FEIS) is presented in Adobe Portable Document Format (.pdf). To view documents, you must have the Adobe Acrobat Reader. If documents do not appear when you click the links below, you must download the Acrobat Reader from the Adobe web site.
Volume 1:
- Introduction
- Chapter 1
- Chapter 2
- Chapter 3
- Chapter 4
- Chapter 5
- Chapter 6
- Chapter 7
- Chapter 8
- Chapter 9
Section 4(f):
Volume 2:
Preferred Alternatives - Plan and Profile
- Greenway Subcorridor: Alternative 1
- Thruway Subcorridor: Alternative 3
- Parkway Subcorridor: Alternative 2
Additional Build Alternatives - Plan and Profile
- Thruway Subcorridor: Alternative 2
- Thruway Subcorridor: Alternative 2a
- Thruway Subcorridor: Alternative 3a
- Parkway Subcorridor: Alternative 1
The Environmental Impact Statement process concluded with the issuance of a signed Record of Decision (ROD) by the Federal Highway Administration (FHWA) on July 18, 2005.
The final project scope approved by the Missouri Highways and Transportation Commission differed slightly from the original Selected Alternative that was evaluated in the original EIS document. The re-evaluation addresses changes to the Selected Alternative presented in the FEIS. The remaining portions of the Selected Alternative from the FEIS not included in the re-evaluation remain unchanged.