MoDOT to close US 67 at I-55 for bridge demolition overnight March 7-9

JEFFERSON COUNTY- Drivers who plan to travel through US Route 67 in the southern portion of Jefferson County on the weekend of March 7-9 should be prepared for delays, as crews demolished the southbound I-55 bridge over US 67. MoDOT will completely close both directions of US 67 starting at night on Friday, March 7 and Saturday, March 8 to remove the southbound Interstate 55 bridge over US 67.

Crews will start closing lanes in both directions of US 67 at 7 p.m. Friday, March 7, with all US 67 lanes being closed by 9 p.m. for the bridge demolition. US 67 will be reopened with a northbound and southbound lane open in each direction by 6 a.m. Saturday, March 8. All US 67 lanes will be closed again by 9 p.m. Saturday, March 8 to continue bridge demolition. US 67 will be reopened with one lane traveling in each direction by 6 a.m. Sunday, March 9. All lanes of US 67 will be reopened by 5 a.m. Monday, March 10th.

Detour routes for the nightly closures on US 67 are:

Northbound traffic on US 67 will be detoured onto southbound I-55 and travel to exit 170 where drivers can exit, travel south on US 61 and continue north via northbound I-55.

Southbound traffic on US 67 detours via westbound Route A to I-55 exit 175 where drivers will be able to continue southbound I-55 to reach southbound US 67.

The loop ramp in the northeast section of the I-55/ US 67 interchange will be closed during the bridge demolition. Drivers on northbound I-55 wanting to travel south on US 67 will be detoured onto northbound US 67 at exit 174 and travel via westbound Route A to I-55 exit 175 where drivers will be able to continue south on I-55 to reach southbound US 67.  All detours will be signed.

This demolition is a part of the 27 bridges that will be addressed within the Interstate 55 Corridor Improvements project in Jefferson County.  Within the scope of this project, 14 bridges will be replaced, and eight bridges will be rehabilitated. MoDOT will replace the superstructure of four bridges and build a completely new Route CC over U.S. Route 67 bridge.

For additional information about current and upcoming detours and project status, please visit the I-55 Corridor Improvement project website at: Interstate 55 Corridor Upgrades in Jefferson | Missouri Department of Transportation (modot.org).

For up-to-date traffic and travel info, motorists can check MoDOT’s Traveler Information Map at http://traveler.modot.org/map/.

 

                                                                                ###

Districts Involved
St. Louis
MODOT Newsroom

The newsroom is a one-stop shop for media partners to find their local and statewide communications contacts and news releases, as well as download department leadership portraits and other media.

Visit the Newsroom
Media Inquiries
Real Time Traffic

Monitor real time traffic with our online traffic map.