St. Joseph, Mo. – The following is a list of general highway maintenance and construction work the Missouri Department of Transportation has planned in the Northwest Missouri region for the week of April 28-May 4.
There also may be moving operations throughout the region, in addition to the work mentioned below. Inclement weather may cause schedule changes in some of the planned work. Check the MoDOT Traveler Information Map at http://traveler.modot.org, or download the app for updated information.
MoDOT asks drivers to work with us by buckling up, putting your phone down, slowing down and moving over in work zones.
Andrew County
Interstate 29 – Resurfacing from U.S. Route 59 north of the Nodaway River to Business 71 north of St. Joseph through July 2025. (Contractor: Herzog Contracting Corp.)
- This project will include intermittent ramp CLOSURES at the following locations between the hours of 7 a.m. and 5 p.m.:
- Northbound I-29 to/from Business 71 (Exit 53 to Savannah), April 29.
- Northbound I-229 to/from northbound I-29 (Exit 14BC), April 30-May 1.
- Northbound I-29 to/from U.S. Route 59 (Exit 65 to Fillmore), May 3.
Route B – CLOSED beginning April 28, for bridge deck replacement at the Upper Neely Bridge through June 2025 (Contractor: Capital Paving & Construction, LLC). https://www.modot.org/projects/route-b-route-dd-and-route-h-bridge-rehabilitation-andrew-and-buchanan
Atchison County
I-29 – Narrowed to one lane in each direction at the Mill Creek Bridges, south of Rock Port, for bridge rehabilitation project through September 2025. (Contractor: Emery Sapp & Sons, Inc).
Route W – Pothole patching from Route J to N Avenue, April 30-May 1, 7 a.m. to 3 p.m.
Buchanan County
Route 752 (Alabama Street) – CLOSED from U.S. Route 59 to Sherman Street for an intersection improvement project through mid-August 2025. (Contractor: Amino Bros. Co., Inc.) https://www.modot.org/projects/route-u-missouri-route-59-and-missouri-route-752-intersection-improvements-buchanan-county
Route DD – CLOSED at the Jenkins Creek Bridge near Gower for a bridge deck replacement project through mid-May. (Contractor: Capital Paving & Construction, LLC). https://www.modot.org/projects/route-b-route-dd-and-route-h-bridge-rehabilitation-andrew-and-buchanan.
Caldwell County
Route D – CLOSED for a bridge replacement project at the Shoal Creek Bridge through early August 2025 (Contractor: Cale Seymour Construction, LLC). https://www.modot.org/route-d-bridge-replacement-caldwell.
Carroll County
Route J - CLOSED at the Bridge Creek Bridge for a bridge replacement project through May 2025. (Capital-Horner & Shifrin).*1
Chariton County
Route D – CLOSED at the Mussel Fork Creek Bridge for a bridge replacement project through July 2025. (Capital-Horner & Shifrin).*1
Route C – Resurfacing project April 28-30. The roadway will be narrowed to one lane with flaggers directing motorists through the work zone. (Contractor: Capital Paving & Construction, LLC)
Route ZZ – Resurfacing project April 28-May 5. The roadway will be narrowed to one lane with flaggers directing motorists through the work zone. (Contractor: Capital Paving & Construction, LLC)
Clinton County
I-35 – Patching on the southbound lanes in preparation for a pavement rehabilitation project from Shoal Creek near the intersection of I-35 to Route 116 through May 2025. (Contractor: Michels Road & Stone). https://www.modot.org/projects/interstate-35-and-us-route-69-concrete-overlay-clinton-county
U.S. Route 69 – Road widening and resurfacing project from Shoal Creek near the intersection of I-35 to Route 116 through June 2025. (Contractor: Michels Road & Stone). https://www.modot.org/projects/interstate-35-and-us-route-69-concrete-overlay-clinton-county
Route 69 – Pothole patching from Route 116 to the Clay County line, April 30.
Route PP – Pothole patching from Route 33 to Route 69, April 28-29.
Route V – Pothole patching from Route 33 to Route 69, May 1.
Route K – Pothole patching from Route 116 to U.S. Route 36, May 2.
Daviess County
Route CC – Bridge rehabilitation project at the Dog Creek Bridge, April 28-30. The roadway will be narrowed to one lane with flaggers directing motorists through the work zone. (Contractor: Capital Paving & Construction, LLC) *2
Route J – Bridge rehabilitation project at the Dog Creek Bridge, May 1-5. The roadway will be narrowed to one lane with flaggers directing motorists through the work zone. (Contractor: Capital Paving & Construction, LLC) *2
I-35 – Concrete replacement northbound driving lane at 74.4 mile marker, south of Pattonsburg, May 1.
Route Y – Pothole patching, April 28.
Route T – Pothole patching from Route 69 to Route A, April 29-May 2.
DeKalb County
Route 6 – Resurfacing project from west of Maysville to Route 31 through April 2025. (Contractor: Herzog Contracting Corp.)
U.S. Route 36 – Concrete replacement eastbound driving lane at Route 33 in Osborn, April 28-29.
Holt County
I-29 – Resurfacing from U.S. Route 59 north of the Nodaway River to Business 71 north of St. Joseph through July 2025. (Contractor: Herzog Contracting Corp.).
- This project will include an intermittent ramp CLOSURE at the ramp from northbound I-29 to/from Route 50 (Exit 67 to Oregon), May 4-5, between 7 a.m. and 5 p.m.
I-29 (northbound) – Slide repair south of Route W near Corning through April 2025 (Contractor: C.P. Excavating, LLC).
Route P – Pothole patching, April 28.
Route O – Pothole patching, April 29.
Route 113 – Pothole patching, April 30-May 2.
Linn County
U.S. Route 36 – Concrete replacement eastbound driving lane from Route F to Route 5, April 28-May 2.
Route TT – CLOSED in one-mile increments for pothole patching from U.S. Route 36 to Route 139 in Chariton County, April 28-May 1, 7 a.m. to 4 p.m. daily.
Route ZZ – Resurfacing project, April 26-May 5. The roadway will be narrowed to one lane with flaggers directing motorists through the work zone. (Contractor: Capital Paving & Construction, LLC)
Livingston County
U.S. Route 65 – Resurfacing project, April 28-May 3. Crews will be repairing entrances and curbs in Chillicothe from Business U.S. 36 working north to Second Street. (Contractor: Capital Paving & Construction, LLC).
Nodaway County
Route NN – CLOSED until further notice at the Platte River Bridge west of Parnell due to significant bridge deterioration. This bridge was awarded to Louis-Company, LLC at the April 2025 Missouri Highways and Transportation Commission meeting. https://www.modot.org/route-nn-bridge-replacement-nodaway.
Route C – CLOSED for bridge deck repairs from Route KK to Catalina Road, April 30-May1.
U.S. Route 71 – Concrete replacement from Route FF to 220th Street, April 29-30.
U.S. Route 71 – Pothole patching from Route FF to Imperial Road, April 28-29.
U.S. Route 136 – Concrete replacement from Route PP to Danube Road, May 1-2.
Route A – Pothole patching from Route H to Route 13, April 30-May 1.
Putnam County
Route U – CLOSED for a culvert replacement from 125th Street to 110th Street, April 30, 6:30 a.m. to 2 p.m.
Worth County
Route M – CLOSED for a bridge deck replacement at the East Fork Grand River Bridge through July 2025. (Contractor: Capital Paving & Construction, LLC). https://www.modot.org/projects/us-route-169-route-b-and-route-m-bridge-rehabilitation-gentry-and-worth
---
*1 This bridge is part of the NWBB (Northwest Bridge Bundle) program. The design-build team is Capital-Horner &Shifrin. More info: NWBB program web page.
*2 This bridge is part of the Safe and Sound Bridge Rehabilitation program. The contractor is Capital Paving & Construction, LLC. More info: Northwest Missouri Safe & Sound Bridge Rehabilitations | Missouri Department of Transportation.
###