Improve I-70 Related Projects
The Improve I-70 Program will plan, design, construct, reconstruct, rehabilitate and repair three lanes in each direction on nearly 200 miles of Interstate 70, from Blue Springs to Wentzville. Many portions of the facility are strained beyond capacity and outdated interchange designs which increase delays and dampen economic activity. In addition to the expansion of I-70, MoDOT is also making other much needed improvements to I-70. These projects can be found below by district.
Kansas City
Buck O'Neil Bridge Project
The John Jordan “Buck” O’Neil Memorial Bridge (formerly the Broadway Bridge), is a triple arch bridge carrying U.S. Highway 169 over the Missouri River and serving as a key regional connection between...
The John Jordan “Buck” O’Neil Memorial Bridge (formerly the Broadway Bridge), is a triple arch bridge carrying U.S. Highway 169 over the Missouri River and serving as a key regional connection between...
I-70 Environmental Assessment in Jackson
MoDOT's Kansas City District, in coordination with the Federal Highway Administration (FHWA), will evaluate improvement alternatives and complete an Environmental Assessment (EA) for Interstate 70 (I-...
MoDOT's Kansas City District, in coordination with the Federal Highway Administration (FHWA), will evaluate improvement alternatives and complete an Environmental Assessment (EA) for Interstate 70 (I-...
I-70 and U.S. 65 Interchange
This project is a partnership between the Saline County Commission and MoDOT in response to the County’s efforts to create economic improvement opportunities at the Marshall Junction. The projec...
This project is a partnership between the Saline County Commission and MoDOT in response to the County’s efforts to create economic improvement opportunities at the Marshall Junction. The projec...
Improve I-70 KC Design-Build Project
The Kansas City District of the Missouri Department of Transportation (MoDOT), in coordination with the Federal Highway Administration (FHWA), is improving Interstate 70 (I-70) between The Paseo Boule...
The Kansas City District of the Missouri Department of Transportation (MoDOT), in coordination with the Federal Highway Administration (FHWA), is improving Interstate 70 (I-70) between The Paseo Boule...
YY over I-70 Bridge
This project will remove and replace the Route YY bridge over Interstate 70 in Saline County. The existing bridge, which was constructed in 1961, is in poor condition and has reached the end of its se...
This project will remove and replace the Route YY bridge over Interstate 70 in Saline County. The existing bridge, which was constructed in 1961, is in poor condition and has reached the end of its se...
Central Missouri
Business Loop 70 Westbound Ramp Removal
Removal of the Interstate 70 westbound ramp to Business Loop 70, including the bridge (L0928) constructed in 1957 over eastbound I-70 in the City of Columbia between Route B (Paris Road) and the I-70/...
Removal of the Interstate 70 westbound ramp to Business Loop 70, including the bridge (L0928) constructed in 1957 over eastbound I-70 in the City of Columbia between Route B (Paris Road) and the I-70/...
Callaway County Route D/I-70 Bridge Roadway and Bridge Improvements
The Callaway County Route D bridge over I-70, approximately 2.3 miles southwest of Williamsburg, was replaced. The contract was awarded to Emery Sapp and Sons, which submitted the low bid o...
The Callaway County Route D bridge over I-70, approximately 2.3 miles southwest of Williamsburg, was replaced. The contract was awarded to Emery Sapp and Sons, which submitted the low bid o...
Cooper County Resurfacing along I-70
This work will require one lane of traffic to be closed at various times and locations while work takes place. Traffic will remain open in the other lane. Construction will be staged in a manner to mi...
This work will require one lane of traffic to be closed at various times and locations while work takes place. Traffic will remain open in the other lane. Construction will be staged in a manner to mi...
I-70 Bridge Rehabilitations over Chouteau Creek
The I-70 bridges over Chouteau Creek in Cooper County, located west of Boonville. The westbound and eastbound I-70 bridges are 20 years old and have reached a point where rehabilit...
The I-70 bridges over Chouteau Creek in Cooper County, located west of Boonville. The westbound and eastbound I-70 bridges are 20 years old and have reached a point where rehabilit...
I-70 Columbia Bridges Design-Build Project
The Columbia I-70 Bridges Project was an $18 million design-build project to replace the I-70 bridges over Business Loop 70/West Boulevard, Garth Avenue, and MO Route 763/Rangeline Street in Columbia,...
The Columbia I-70 Bridges Project was an $18 million design-build project to replace the I-70 bridges over Business Loop 70/West Boulevard, Garth Avenue, and MO Route 763/Rangeline Street in Columbia,...
I-70 over Perche Creek Resurfacing
Below are details, resources and news about the rehabilitations of the Interstate 70 bridges over Perche Creek in Boone County, west of Columbia. The old eastbound bridge was ...
Below are details, resources and news about the rehabilitations of the Interstate 70 bridges over Perche Creek in Boone County, west of Columbia. The old eastbound bridge was ...
I-70 Rocheport Bridge Replacement
This bridge has been called the “lynchpin of America.” It not only connects two counties in Missouri, Boone and Cooper, it connects Missouri’s largest cities, St. Louis and Kansas City, and it connect...
This bridge has been called the “lynchpin of America.” It not only connects two counties in Missouri, Boone and Cooper, it connects Missouri’s largest cities, St. Louis and Kansas City, and it connect...
I-70/Route 54 Kingdom City Interchange Study & Re-Evaluation of Environmental A…
The Missouri Department of Transportation (MoDOT) is working with a consultant team to prepare a traffic and safety study that will explore improvements to the interchange of Interstate 70/U.S. Route ...
The Missouri Department of Transportation (MoDOT) is working with a consultant team to prepare a traffic and safety study that will explore improvements to the interchange of Interstate 70/U.S. Route ...
I-70 at Sorrels Overpass
Below are details, resources and news about the rehabilitation of the Sorrels Overpass bridge over Interstate 70 in Boone County, west of Columbia. Traffic volume is up to 500...
Below are details, resources and news about the rehabilitation of the Sorrels Overpass bridge over Interstate 70 in Boone County, west of Columbia. Traffic volume is up to 500...
Improve I-70 Columbia
MoDOT is conducting a study with its consultant team to identify ways to improve the interstate as it crosses through Boone County. This section of I-70 is an 18-mile stretch from just east of Route B...
MoDOT is conducting a study with its consultant team to identify ways to improve the interstate as it crosses through Boone County. This section of I-70 is an 18-mile stretch from just east of Route B...
Westbound I-70 Bridge Rehabilitations
Rehabilitations of the westbound I-70 bridge over Little Cedar Creek in Boone County and the westbound I-70 bridge over Cedar Creek in Callaway County, both located east of Columbia. Both bridges...
Rehabilitations of the westbound I-70 bridge over Little Cedar Creek in Boone County and the westbound I-70 bridge over Cedar Creek in Callaway County, both located east of Columbia. Both bridges...
Westbound I-70 Bridge Rehabilitation over Auxvasse Creek
The project consists of replacing the guardrail and expansion joint, rehabilitating the bearings, and repairing the structural steel girder end of the westbound I-70 bridge over Auxvass...
The project consists of replacing the guardrail and expansion joint, rehabilitating the bearings, and repairing the structural steel girder end of the westbound I-70 bridge over Auxvass...
Northeast Missouri
Mineola Hill Climbing Lanes Design-Build Project
The project’s primary purpose is to construct eastbound and westbound truck climbing lanes near Mineola Hill to enable traffic to flow more safely and efficiently and to replace the bridges within the...
The project’s primary purpose is to construct eastbound and westbound truck climbing lanes near Mineola Hill to enable traffic to flow more safely and efficiently and to replace the bridges within the...
Missouri Route 19 Bridge Replacement and Interchange Improvement over I-70
HANNIBAL – The Missouri Department of Transportation will be replacing the Missouri Route 19 bridge over Interstate 70 near New Florence, with construction beginning in the Fall of 2022. The new...
HANNIBAL – The Missouri Department of Transportation will be replacing the Missouri Route 19 bridge over Interstate 70 near New Florence, with construction beginning in the Fall of 2022. The new...
I-70 Resurfacing in Montgomery County
Paving work is expected to start in March as weather and temperatures allow and will continue until mid-June. Total limits of project are MM 164 to MM 182. Expect this to include ramp clos...
Paving work is expected to start in March as weather and temperatures allow and will continue until mid-June. Total limits of project are MM 164 to MM 182. Expect this to include ramp clos...
Improve I-70 in St. Charles, Warren, and Montgomery Counties
The Missouri Department of Transportation is re-evaluating the findings of that 2005 Interstate 70 Environmental Study by reviewing more than 30 miles of I-70 in Montgomery County, Warren County, and ...
The Missouri Department of Transportation is re-evaluating the findings of that 2005 Interstate 70 Environmental Study by reviewing more than 30 miles of I-70 in Montgomery County, Warren County, and ...
St. Louis
Broadway over I-44 Bridge and Ramp Replacement
The Missouri Department of Transportation needs to replace the bridge carrying southbound Broadway over Interstate 44 in the downtown city of St. Louis area. As a part of this project, the ramp ...
The Missouri Department of Transportation needs to replace the bridge carrying southbound Broadway over Interstate 44 in the downtown city of St. Louis area. As a part of this project, the ramp ...
David Hoekel Parkway Phase 2: I-70 Interchange
The David Hoekel Parkway & Interstate 70 Interchange Project shall consist of grading of eastbound ramps, construction of bridges over Interstate 70 and the Norfolk Southern Railroad, and paving o...
The David Hoekel Parkway & Interstate 70 Interchange Project shall consist of grading of eastbound ramps, construction of bridges over Interstate 70 and the Norfolk Southern Railroad, and paving o...
Envision I-70
The final I-70 Planning and Environmental Linkage Study (I-70 PEL) report is below. It includes an executive summary, the study's vision and purpose, final study recommendations and all appendices.
The final I-70 Planning and Environmental Linkage Study (I-70 PEL) report is below. It includes an executive summary, the study's vision and purpose, final study recommendations and all appendices.
I-64/I-70/U.S. 61 Interchange
The I-70/I-64 interchange serves a large amount of traffic volume daily, with additional growth anticipated in the future. Currently, approximately 75,000 vehicles use I-64 south of the intercha...
The I-70/I-64 interchange serves a large amount of traffic volume daily, with additional growth anticipated in the future. Currently, approximately 75,000 vehicles use I-64 south of the intercha...
I-70 Bridge Rehabilitation Project
This bridge rehabilitation project consists of work on 12 bridges along Interstate 70 in St. Charles County. Work will consist of repairing areas of deteriorated concrete, replacing the bridge dr...
This bridge rehabilitation project consists of work on 12 bridges along Interstate 70 in St. Charles County. Work will consist of repairing areas of deteriorated concrete, replacing the bridge dr...
I-70 at Cave Springs
The I-70 Cave Springs to Fairgrounds project is a Design-Build project that will make improvements to address the connectivity, safety and congestion problems that have impacted this region for decade...
The I-70 Cave Springs to Fairgrounds project is a Design-Build project that will make improvements to address the connectivity, safety and congestion problems that have impacted this region for decade...
I-70 Improvements from Wentzville Parkway to Route Z
The goal of the project is to improve the capacity, safety, and reliability of I-70 between Wentzville Parkway and I-64. The project will shift I-70 to the southeast, add lanes and replace the existin...
The goal of the project is to improve the capacity, safety, and reliability of I-70 between Wentzville Parkway and I-64. The project will shift I-70 to the southeast, add lanes and replace the existin...
Wentzville Parkway South Extension Phases 1 and 2
The interchange improvements to Wentzville Parkway at I-70 will remove the existing eastbound on-ramp and fold it to move the ramp terminal to the outer road. Traffic southbound on Wentzville Parkway ...
The interchange improvements to Wentzville Parkway at I-70 will remove the existing eastbound on-ramp and fold it to move the ramp terminal to the outer road. Traffic southbound on Wentzville Parkway ...
Improve I-70 in St. Charles, Warren, and Montgomery Counties
The Missouri Department of Transportation is re-evaluating the findings of that 2005 Interstate 70 Environmental Study by reviewing more than 30 miles of I-70 in Montgomery County, Warren County, and ...
The Missouri Department of Transportation is re-evaluating the findings of that 2005 Interstate 70 Environmental Study by reviewing more than 30 miles of I-70 in Montgomery County, Warren County, and ...