Improve I-70: Warrenton to Wentzville Plans and Displays

Proposal Highlights

The selected Design-Build contractor team, Improve 70 Alliance, was one of three shortlisted Design-Build teams. The winning proposal highlights engineering and design endeavors set out before the teams and an understanding of the local, statewide, and national importance of an improved I-70. The winning proposal includes: 

  • Constructing a third lane in each direction on I-70 from Warrenton to I-64 in Wentzville, including replacing the existing I-70 lanes with new full-depth concrete pavement. 

  • Interchange improvements at I-70 and the I-64/Route 61 interchange. 

  • Interchange and outer road improvements in Foristell, Wright City, Warrenton, and at Route Z. 

  • Realignment at the railroad bridge on I-70 between Wentzville Parkway and Route Z. 

  • Addition of a third lane of travel to eastbound and westbound I-64 between I-70 and Route K. 

  • The team has also committed to keeping two lanes of travel open on I-70 in both directions during peak travel times.

Project Renderings

Proposed design renderings of Improve I-70 Warrenton to Wentzville. More renderings and information are avaliable on this webpage.

Use the gallery above to slide through each available construction phasing video. More videos wil be available as construction continues.