PDF Files
- 203.00E Excavation and Embankment - Effective 08/01/98
- 203.02F Undergrading (2-sheets) - Effective 01/01/04
- 203.10D Tabulated Earthwork and Section Data - Effective 02/01/09
- 203.20G Superelevation, Spirals and Widening (Undivided Highway) (4-sheets) - Effective 07/01/17
- 203.21K Superelevation, Spirals and Widening (Divided Highway) (3-sheets) - Effective 07/01/07
- 203.22A Superelevation, Spirals and Widening (2-sheets) - Effective 04/01/24
- 203.35A Mailbox Turnouts - Effective 08/01/81
- 203.40G Typical Details on and Off Ramps (2-sheets) - Effective 10/01/07
- 203.41F Typical Details on and Off Ramps (Roadway with 6:1 Foreslope) (2-sheets) - Effective 01/01/95
- 203.50N Typical Median Openings (Divided Highways) (2-sheets) - Effective 04/01/16
- 203.61B Driveway Type I - Effective 07/01/20
- 203.62E Driveway Type II (2-sheets) - Effective 07/01/20
- 203.63C Driveway Type III (2-sheets) -Effective 07/01/20
- 203.64E Driveway Type IV (2-sheets) - Effective 07/01/20
- 203.65B Driveway Type V - Effective 07/01/20
- 204.00D Embankment Control Measuring Devices - Effective 04/01/83
- 204.30 Pore Pressure Measuring Devices - Effective 03/01/96
The documents are provided in Acrobat Reader format. Free Acrobat Reader download