Submitted by: Southeast District
Innovation Description and Benefit:
Culvert Dollies eliminate the need for an extra piece of equipment that would normally be required to move the pipes. A minimum of two dollies under each pipe makes it to where two employees can maneuver the pipe down the road and bolt the band on with ease.
For More Information Contact
Southeast District - Maintenance
Bobby Holmes at Robert.Holmes@modot.mo.gov or 417-469-9008.